Evaluation Studies for Irrigation Projects (done by CWC)

From
Jump to: navigation, search

Contents

Performance Evaluation of Completed Irrigation Projects

Water-Use Efficiency Studies

Andhra Pradesh

1. Bhairavanitippa Project

2. Gajuladinne (Sanjeevaiah Sagar Project)

3. Gandipalem Project

4. Godavari delta System (Sir aruther Cotton Barrage)

5. Kaddam project

6. Koil Sagar

7. Krishna Delta System (Prakasam Barrage)

8. Kurnool-Cuddapah Canal System

9. Nagarjuna Sagar Project

10. Narayanapuram Project

11. Nizam Sagar project

12. Rajolibanda Diversion project

13. Somasila Project

14. Sri Ram Sagar Project

15. Srisailam Project

16. Tungabhadra High Level Canal

17. Tungabhadra Low Level Canal

18. Upper Manair

19. Vamsadhara

20. Yeleru Project

Bihar

1. Durgawati Irrigation Project

2. Eastern Sone Canal

3. Eastern Sone Canal

4. Kamla Irrigation Project

5. Upper Morhar

Haryana

1. Augmentation Canal Project

2. Nagal Lift Project

Punjab

1. Dholabha dam Project

2. Ranjit Sagar Project

Uttar Pradesh

1. Ahraura Dam Project

2. East Baigul Project

3. Matatila Dam Project

4. Naugarh Irrigation Project

5. Pili Dam Project

6. Walmiki Sarovar Project

Environment Impact Assessment Studies of Completed Project

Personal tools
Namespaces
Variants
Actions
Navigation
Topics
Toolbox

Either scripts and active content are not permitted to run or Adobe Flash Player version 10.0.0 or greater is not installed.

Get Adobe Flash Player