Accelerated Irrigation Benefit Programme (AIBP) was launched by Union Government in 1996-97 to provide central assistance in the form of loan to State Government to complete those ongoing irrigation projects which were costing Rs.1000 crore or above and were in advanced stage of completion. Subsequently the criteria for inclusion of irrigation projects under AIBP were changed from time to time so as to include all categories of projects i.e. major, medium and minor (surface irrigation) projects to bring regional balance. From 2005-06 onwards, central assistance is now provided in form of grant till 2011-12. A total sum of Rs. 49297.39 crore has been provided to State Governments in form of Central assistance under AIBP till September 2012 out of which Rs 44650.95 crore is for Major & Medium Irrigation Projects and Rs.8278.06 crore is for Minor Irrigation projects. Irrigation potential created from Major & Medium projects under AIBP till March, 2011 is. 63.46 lakh hectare, while that created through Minor projects is 8.88 Lakh ha (upto January, 2011). Since inception altogether 293 major/medium projects have been included under AIBP out of which 141 projects have been completed and 5 projects have been deferred, leaving 147 projects as ongoing. Similarly, total 12768 surface Minor Irrigation Schemes have been sanctioned since inception of AIBP, out of which 9125 schemes have been completed.

Important features of guidelines for release of central assistance to states under AIBP are as under:-

  1. Major/medium projects including Extension Renovation & Modernization projects benefiting drought prone/tribal areas and flood prone areas are eligible for 90% grant assistance.
  2. Major/medium projects in the Special Category States and projects in undivided Karaput, Bolangir and Kalahandi districts of Orissa are also eligible for 90% grant assistance.
  3. Other major/medium projects are eligible for 25% grant assistance under AIBP.
  4. Surface MI schemes fulfilling criteria specified in the guidelines of the Special Category States are eligible for 90% grant assistance and surface MI schemes of the non special category states fulfilling eligibility criteria and benefiting drought prone/tribal areas are also eligible for 90% grant assistance.
  5. Maximum time allowed for completion of major/medium projects under AIBP is 4 years excluding the year of inclusion of the project under AIBP.
  6. The Maximum time allowed for completion of surface MI schemes under AIBP is 2 years excluding the year of inclusion of the scheme under AIBP.
  7. The state governments are required to enter into an MOU with the Ministry of Water Resources for timely completion of the project specifying year wise targets of potential creation under AIBP.
  8. A new major/medium project may be included in AIBP only on completion of an ongoing project under AIBP on one to one basis. However, projects benefiting drought prone/tribal areas, projects in the states having irrigation development below national average and projects included in the Prime Minister’s package for agrarian distressed districts of the Andhra Pradesh, Karnataka, Kerala and Maharashtra may be included in AIBP in relaxation to one to one criterion.

The State-Wise status of AIBP project is given as under:

AIBP 2013.jpg

Table: Details of AIBP Projects
Sl.No.Name of Major Medium Irrigation ProjectsAIBP Project Name State Year of inclusion under AIBPStatus (Completed/Ongoing)Year of completion (Rs. Crore)Target Potential under AIBP (Th ha)Latest Estimated Cost of AIBP Components (Rs. Crore)Total CLA/Grant relesaed upto (3/12) (Rs. Crore)Total expenditure incurred upto (3/2011) (Rs. Crore)Total potential created upto(3/2012) (Th ha)
1Ali Sagar Lift Irrigation ProjectAlisagar LISAndhra Pradesh2006-07Completed2006-0721.77227.6916.3788.2721.769
2Gundalakamma Major Irrigation ProjectGundlakdammaAndhra Pradesh2005-06Ongoing32.4781.8599.352428.623.44
3Guthpa (Argul Rajaram) Lift Irrigation ProjectGuthpa LISAndhra Pradesh2006-07Completed2008-0915.69872.9117.572.9115.698
4Indira Sagar /Polavaram Major Irrigation ProjectIndira Sagar (Polavaram)Andhra Pradesh2008-09Ongoing4365,974.72562.4691,987.780
5Jurala (Priyadarshini) Major Irrigation ProjectPriyadarshini JuralaAndhra Pradesh1997-98Completed2006-0740.16459.9245.189451.60840.16
6Pushkaram Lift Irrigation ProjectPushkara LISAndhra Pradesh2006-07Ongoing71.184196.2447.085378.5448.559
7Somasila Major Irrigation ProjectSomasilaAndhra Pradesh1997-98Completed2006-0738.475230.081164.525263.90939.774
8Sriram Sagar Stage - I (Pochampad) Major Irrigation ProjectSriramsagar St.IAndhra Pradesh1996-97Completed2005-06137.04568.42327.17512.31137.04
9Tadipudi Lift Irrigation ProjectTadipudi LISAndhra Pradesh2006-07Ongoing83.609285.7448.22335.2350.601
10Thotapalli Barrage Major Irrigation ProjectThotapally Barrage Andhra Pradesh2005-06Ongoing48.563420.9499.731405.8225.9
11Vamsadhara Stage - II Phase - I Major Irrigation ProjectVamsdhara St-II Ph IAndhra Pradesh2003-04Completed2008-0917.10386.81137.11682.78624.487
12Annamayya (Cheyyeru) Medium Irrigation ProjectCheyyeru(Annamaya)Andhra Pradesh1996-97Completed2003-049.10547.1425.3347.149.105
13Gollavagu Medium Irrigation ProjectGollavaguAndhra Pradesh2006-07Ongoing3.84575.6860.4762.540.607
14Gundlavagu Medium Irrigation ProjectGundalavaguAndhra Pradesh2000-01Completed2006-071.04514.754.00511.041.045
15Kanupur Canal Medium Irrigation ProjectKanupur CanalAndhra Pradesh2000-01Deffered0.5619.781.921.420
16Maddigedda Medium Irrigation ProjectMaddigeddaAndhra Pradesh2000-01Completed2006-071.4157.23.7926.711.415
17Madduvalasa Medium Irrigation ProjectMadduvalasaAndhra Pradesh1998-99Completed2005-0610103.54866.894.44810
18Mathadivagu Medium Irrigation ProjectMathadivaguAndhra Pradesh2006-07Ongoing3.4442.2137.0244.342.024
19Musurumilli Medium Irrigation ProjectMusurumilliAndhra Pradesh2007-08Ongoing9.164153.5285.742127.086.537
20Palemvagu Medium Irrigation ProjectPalemvagu Andhra Pradesh2005-06Ongoing4.163.579.53669.0440
21Neelwai Medium Irrigation ProjectNeelwai Andhra Pradesh2006-07Ongoing5.2677.7718.466.550
22Ralivagu Medium Irrigation ProjectRalivaguAndhra Pradesh2006-07Ongoing2.42829.826.7137.721.012
23Sri Komarambheem Medium Irrigation ProjectSri Komaram BheemAndhra Pradesh2006-07Ongoing9.915201.74145.54281.420
24Swarnamukhi Barrage Medium Irrigation ProjectSwarnamukhiAndhra Pradesh2005-06Completed2008-094.65679.0811.86239.873.651
25Tarakarama Thirtha Sagaram Medium Irrigation ProjectTarakarama thirtha Sagaram Andhra Pradesh2005-06Ongoing10220.0433.00667.4530
26Veligallu Medium Irrigation ProjectVeligalluAndhra Pradesh2006-07Completed2008-099.71372.5162.33663.8539.713
27Yerrakalva Medium Irrigation ProjectYerrakalva Res.Andhra Pradesh2000-01Ongoing6.96189.5728.46372.0675.06
28Jclis - Glis St-I, II, III Major Irrigation Project_Andhra PradeshJ. Chokka Rao LISAndhra Pradesh2006-07Ongoing2498,200.711,139.2614,238.4616.188
29Peddavagu Medium Irrigation ProjectPeddavaguAndhra Pradesh2006-07Ongoing6.073124.64106.02556.540
30FFC from SRSP (Indiramma Flood Flow canal)FFC of SRSPAndhra Pradesh2005-06Ongoing403,002.47382.42,134.420
31Rajiv Bhima Lift Irrigation ProjectRajiv Bhima LISAndhra Pradesh2007-08Ongoing82.1531,3771,165.671853.180
32SRSP - II Major Irrigation ProjectSRSP St.IIAndhra Pradesh2005-06Ongoing178.066736.58139.467505.81119.416
33Modernization of JamunaMod. of Jamuna Irr.Assam2001-02Completed2008-0913.75859.76936.36353.14312.7
34Buridihing Lift Irrigation ProjectBurhi Dihing liftAssam1997-98Ongoing4.4915.1994.2249.5552.425
35Hawaipur Lift Irrigation ProjectHawaipur liftAssam1996-97Completed2006-073.8879.664.9658.723.887
36Rupahi Medium Irrigation ProjectRupahi Lift Assam1996-97Completed2001-022.7681.6550.6552.1772.768
37Dhansiri Major Irrigation ProjectDhansiriAssam1996-97Ongoing68.366267.892145.597180.98341.258
38Bordikarai Major Irrigation ProjectBordikaraiAssam1997-98Completed2004-057.40619.5067.01319.4597.203
39Champamati Major Irrigation ProjectChampamatiAssam1996-97Ongoing24.994273.9466.23751.8489.746
40Integrated Kallong Basin Lift Irrigation ProjectIntg. Irr. Scheme in Kollong Basin Assam1997-98Completed2006-078.64771.0812.98233.63.775
41Borolia Medium Irrigation ProjectBoroliaAssam1996-97Ongoing13.562107.1429.80252.9683.3
42Pahumara Medium Irrigation ProjectPahumaraAssam1996-97Completed2008-0911.75519.4169.2918.06710.551
43Sone Barrage Remodelling And Link CanalSone ModernisationBihar1998-99Completed2008-09314.58664.258168.449635.491290.58
44Bansagar Dam Major Irrigation Project_BiharBansagarBihar1997-98Ongoing94366.82583.5334.8660
45Batane Major Irrigation Project_Bihar BataneBihar2000-01Ongoing4.80677.0243.33540.660
46Bilasi Medium Irrigation ProjectBilasi Reservoir Bihar1997-98Completed2000-01416.7623.3916.7624
47Durgavati Major Irrigation ProjectDurgawatiBihar1996-97Ongoing20.297896.6565.09399.5113.3
48Orni Medium Irrigation ProjectOrni ReservoirBihar1997-98Completed2006-079.55728.88311.40129.1179.459
49Punpun Barrage Major Irrigation ProjectPunpunBihar2007-08Ongoing13.68619.08643.884196.1850
50Upper Kiul Major Irrigation ProjectUpper KiulBihar1996-97Completed2006-0711.6894.50722.57983.48510.18
51Western Kosi Canal Major Irrigation ProjectWestern KosiBihar1996-97Ongoing212.051,069.25252.099986.038145.675
52KharungKharung(ERM)Chhattisgarh2010-11Ongoing10.345.94.510.895
53Maniyari Maniyari Tank (ERM)Chhattisgarh2011-12Ongoing11.478159.9522.2520
54Barnai Medium Irrigation ProjectBarnai Chhattisgarh2002-03Completed2006-071.5082.652.654.9141.508
55Jonk Diversion Major Irrigation ProjectJonk DiversionChhattisgarh1999-2000Completed2006-079.56917.627.616.0487.87
56Kosarteda Medium Irrigation ProjectKosertedaChhattisgarh2002-03Ongoing11.12138.2854.773130.1826.5
57Kelo Major Irrigation ProjectKelo ProjectChhattisgarh2008-09Ongoing22.81482.227.023243.490
58Mahanadi Major Irrigation ProjectMahanadi Res ProjectChhattisgarh2005-06Completed2010-1113.883235.6726.954284.6813.76
59Shivnath Medium Irrigation ProjectShivnath DiversionChhattisgarh1997-98Completed2002-035.2386.643.546.5615.238
60Sutiapat Medium Irrigation ProjectSutiapat Chhattisgarh2010-11Ongoing2.937.3556.3187.0980.6
61Hasdeo Bango Major Irrigation ProjectHasdeo BangoChhattisgarh1997-98Completed2006-0786.5304.74243.78390.75686.5
62Hasdeo Bango Major Irrigation ProjectMinimata (Hasdeo Bango Ph. IV)Chhattisgarh2007-08Completed2010-1138.4111.0866.00497.0838.4
63Salaulim Major Irrigation ProjectSalauli Ph-IGoa1997-98Completed2006-079.329.6917.7526.5179.3
64Tillari Major Irrigation Project_GoaTillariGoa2000-01Ongoing14.521409.922247.42238.7688.747
65Sipu Major Irrigation ProjectSipu Gujarat1996-97Completed1999-20001.01616.9056.45515.9851.016
66Watrak Major Irrigation ProjectWatrak Gujarat1997-98Completed1999-20003.7149.363.119.2113.714
67Damanganga Major Irrigation Project_Gujarat Damanganga Gujarat1997-98Completed1999-20006.68628.4849.4728.4846.686
68Karjan Major Irrigation ProjectKarjan Gujarat1997-98Completed1999-20005.98917.27.617.685.989
69Sukhi Major Irrigation ProjectSukhi Gujarat1997-98Completed1999-20003.48813.685.6513.333.488
70Umaria Medium Irrigation ProjectUmaria Gujarat1996-97Completed1996-970.1620.60.1350.60.162
71Harnav - II Medium Irrigation ProjectHarnav - II Gujarat1996-97Completed1997-9800.30.0650.30
72Jhuj Medium Irrigation ProjectJhuj Gujarat1996-97Completed1999-20002.90715.794.7415.792.907
73Deo Medium Irrigation ProjectDeo Gujarat1997-98Completed1997-980.1030.470.50.470.103
74Sardar Sarovar Major Irrigation Project_GujaratSardar SarovarGujarat1996-97Ongoing1,79227,150.135,736.77810,736.45545.276
75Mukteshwar Medium Irrigation ProjectMukteshwarGujarat1996-97Completed2006-075.06622.66510.86247.025.066
76Ozat - II Medium Irrigation ProjectOzat-IIGujarat2000-01Completed2009-101.837.93313.688.4333.338
77Aji - IV Medium Irrigation ProjectAji-IVGujarat2000-01Completed2009-103.7556.30614.706126.2323.75
78Bhadar - II Medium Irrigation ProjectBhadar-IIGujarat2002-03Completed2010-111.546.3128.56829.5426
79Brahmini - II Medium Irrigation ProjectBrahmini-IIGujarat2000-01Completed2008-092.06212.45418.3072.062
80Gurgaon Canal Major Irrigation Project_HaryanaGurgaon canalHaryana1996-97Completed2003-043.3412.53.3410
81Jawahar Lal Nehru Lift Irrigation ProjectJ. L. N. Lift Irr.Haryana1997-98Deffered6915.7651215.7650
82Sidhatha Medium Irrigation ProjectSidhataHimachal Pradesh2000-01Ongoing5.3564.49962.5869.8130.823
83Shahnehar Major Irrigation Project_Himachal PradeshShahnehar Irr. projectHimachal Pradesh1997-98Ongoing24.76303.567203.855283.2418.026
84Balh Valley Left Bank Medium Irrigation ProjectBalh Vally (Left Bank)Himachal Pradesh2009-10Ongoing4.35495.39355.22162.9820.94
85Changer Lift Irrigation ProjectChanger LiftHimachal Pradesh2000-01Ongoing3.04187.49557.23877.8343.041
86Modernisation of Kathua Canal Med Irrigation ProjectMod. of Kathua CanalJammu & Kashmir1999-2000Completed2006-073.20711.187.61613.6713.207
87Modernisation of Martand Canal(Medium,Erm)Mod. of Martand CanalJammu & Kashmir2006-07Completed2010-111.78915.03514.89913.5571.789
88Mod Of Ranbir Canal Project (Revised Major) (Erm)Mod. of Ranbir CanalJammu & Kashmir1999-2000Ongoing13.666146.842108.2112.2277.442
89Mod Of New Pratap CanalMod. of New Pratap CanalJammu & Kashmir1999-2000Ongoing2.61944.6733.10431.1982.348
90Mod of Zaingir CanalMod. of Zaingir CanalJammu & Kashmir2001-02Completed2006-072.146.6424.8496.0232.14
91Mod. of Ahaji Canal Medium Irrigation ProjectMod. of Ahji CanalJammu & Kashmir2008-09Ongoing2.21515.63312.0918.0720.73
92Mod. of Babul Canal(Medium,Erm) ProjectMod. of Babul Canal Jammu & Kashmir2007-08Completed2011-120.6898.6046.7584.70.289
93Mod. of Dadi Canal Medium Irrigation SchemeMod. of Dadi CanalJammu & Kashmir2006-07Ongoing2.57338.8534.50235.0811.973
94Mod. of Mavkhul Canal Medium Irrigation ProjectMod. of Mav KhulJammu & Kashmir2006-07Completed2010-112.5478.1847.1053.232.547
95Modernisation of ravi canalRestoration & Mod. Of Main Ravi CanalJammu & Kashmir2011-12Ongoing38.51755.68.9100
96Igo Phey (Ego-Phey Canal) Medium Irrigation ProjectIgopheyJammu & Kashmir2000-01Completed2006-073.47314.049.6313.673.473
97Kandi Canal Medium Irrigation ProjectMod. Kandi Canal Jammu & Kashmir2007-08Ongoing3.22952.9116.200
98Koil Lift Irrigation ProjectKoil LiftJammu & Kashmir1996-97Completed2006-072.15-0.500
99Lethpora Lift Irrigation ProjectLethpora LiftJammu & Kashmir1996-97Completed2006-072.6583.133.3163.0272.656
100Marwal Lift Irrigation ProjectMarwal LiftJammu & Kashmir1996-97Completed2006-0711.39-0.300
101Rafiabad High Lift Irrigation ProjectRafiabad High Lift Irr.Jammu & Kashmir2001-02Completed2010-112.93243.71835.32344.5292.932
102Rajpora Lift Irrigation ProjectRajpora LiftJammu & Kashmir2000-01Ongoing2.4364.57953.08255.2711.593
103Tral Lift /Gral Lift Irrigation ProjectTral LiftJammu & Kashmir2000-01Ongoing6132.0763.5256.4380.91
104Parkachick Khawas Medium Irrigation ProjectPrakachik Khows CanalJammu & Kashmir2007-08Ongoing2.26234.948.4426.5540.4
105Gumani Barrage Major Irrigation ProjectGumaniJharkhand1997-98Ongoing16.194161.71731.402128.3620
106Kansjore Medium Irrigation ProjectKansjore Jharkhand1997-98Ongoing6.26434.411.0436.2556.264
107Latratu Medium Irrigation ProjectLatratu Jharkhand1997-98Completed2002-036.14.672.134.676.1
108Panch Khero Medium Irrigation ProjectPanchkheroJharkhand2004-05Ongoing3.08554.6498.24247.2260
109Sonua Medium Irrigation ProjectSonuaJharkhand1997-98Ongoing8.00861.13919.24654.2120
110Subernarekha Multipurpose Project_JharkhandSubernarekha Multipurpose Jharkhand2011-12Ongoing874.6335.544.555
111Surangi Medium Irrigation ProjectSurangiJharkhand1997-98Ongoing2.60134.70613.28431.0070
112Tapkara Medium Irrigation ProjectTapkara Reservoir Jharkhand1997-98Completed2002-031.8190.860.5150.861.52
113Upper Sankh Medium Irrigation ProjectUpper SankhJharkhand2004-05Ongoing7.06989.06426.3580.9570.4
114Modernisation of Bhadra canalMod. Canal System of Bhadra Reservoir Canal System (ERM)Karnataka2008-09Ongoing24.1149321721.6147.561
115Renovation & Restoration of Bheemasamudra Tank & its canalRestoration Bhimasamundra TankKarnataka2009-10Ongoing0.88.65556.1240.0080
116Upper Krishna Stage - I Major Irrigation ProjectUpper Krishna St.I Karnataka1996-97Ongoing243.9042,135.41,380.6632,120.679148.799
117Bhima Lift Irrigation ProjectBhima LISKarnataka2009-10Ongoing24.292551.93156.6227.150.581
118Gandorinala Medium Irrigation ProjectGandori NalaKarnataka2001-02Ongoing8.094214.17113.911172.627.943
119Guddada Mallapura Medium Irrigation ProjectGuddada Malapura LiftKarnataka2009-10Ongoing5.261115.457.24352.8260
120Ghataprabha Major Irrigation ProjectGhataprabha St.IIIKarnataka1997-98Completed2010-11148.8778.9447.283823.256111.574
121Hippargi Major Irrigation ProjectHipparagi LISKarnataka2008-09Ongoing74.7421,254.98640.37553.39931.813
122Hirehalla Medium Irrigation ProjectHirehallaKarnataka1996-97Completed2006-078.33157.9264.24128.454.18
123Karanja Major Irrigation ProjectKaranjaKarnataka1997-98Ongoing30.966481.427189.03251.7718.119
124Malaprabha Major Irrigation ProjectMalaprabhaKarnataka1996-97Ongoing48.09387.42359.545358.00649.031
125Maskinala Medium Irrigation ProjectMaskinallahKarnataka2002-03Completed2003-043.0013.8353.223.8353.502
126Upper Krishna Stage - II Major Irrigation ProjectUpper Krishna St.IIKarnataka2001-02Ongoing178.3213,151.7341,517.3092,700.37165.247
127Varahi Major Irrigation ProjectVarahiKarnataka2007-08Ongoing15.56405.2968.535247.940.383
128Votehole Medium Irrigation ProjectVoteholeKarnataka2007-08Completed2008-0901.30.2900
129Dolaithabi Barrage Medium Irrigation ProjectDudhgangaKarnataka2008-09Ongoing11.367727.50626.630
130Chitturpuzha Major Irrigation ProjectChitturpuzha Kerala2010-11Ongoing4.96434.575.8524.9796.226
131Kanhirapuzha Major Irrigation ProjectKanhirapuzhaKerala2008-09Ongoing1.247305.0714.3181.24
132Kallada Major Irrigation ProjectKalladaKerala1996-97Completed2004-059.27667.96532.564.669.276
133Muvattupuzha Major Irrigation ProjectMuvattupuzhaKerala2000-01Ongoing32.105293133.129286.34625.654
134Karapuzha Medium Irrigation ProjectKarapuzhaKerala2006-07Ongoing9.8741282.7199.4250.608
135Banjar River Project Medium Irrigation Project_Madhya PradeshBanjar Madhya Pradesh2000-01Completed2002-031.0952.381.1962.381.095
136Bansagar Unit - II Major Irrigation ProjectBansagar Unit-II(CCA)Madhya Pradesh2003-04Ongoing154.5431,851.78368.4281,932.484128.744
137Bargi Diversion Major Irrigation ProjectBargi Diversion Ph - IMadhya Pradesh2001-02Ongoing21.194411140.645392.05615.248
138Bargi Diversion Major Irrigation ProjectBargi Diversion Ph -I IMadhya Pradesh2002-03Ongoing31.899322.71125.54281.12221.584
139Bargi Diversion Major Irrigation ProjectBargi Diversion Ph -I I IMadhya Pradesh2007-08Ongoing261,229.1555.994325.820
140Bargi Diversion Major Irrigation ProjectBargi Diversion Ph-IVMadhya Pradesh2008-09Ongoing34751.037.369176.040
141Bariyarpur Left Bank Canal Major Irrigation ProjectBariarpur LBCMadhya Pradesh2000-01Ongoing43.85365.78100.581258.7332.46
142Bawanthadi Major Irrigation Project_Madhya PradeshBawanthadiMadhya Pradesh2003-04Ongoing29.412587.1691.959221.98128.018
143Indira Sagar (Unit II) Major Irrigation ProjectIndira Sagar Canal Ph. IIIMadhya Pradesh2007-08Ongoing20.7704.4686.26232.760
144Indira Sagar (Unit II) Major Irrigation ProjectIndira Sagar Unit IVMadhya Pradesh2008-09Ongoing19.6298.0148.48353.430
145Indira Sagar (Unit II) Major Irrigation ProjectIndira Sagar Unit- II (CCA)Madhya Pradesh1996-97Ongoing62.21,354.67696.8231,226.79535.78
146Jobat (Shahid Chandra Shekhar Azad Sagar) Major Irrigation ProjectJobatMadhya Pradesh2010-11Ongoing2.84841.016.667.312.048
147Lower Goi Major Irrigation ProjectLower GoiMadhya Pradesh2008-09Ongoing15.686332.71170.683130.7150
148Mahan (Gulab Sagar) Major Irrigation ProjectMahanMadhya Pradesh2003-04Ongoing19.74395.1131.48187.889
149Mahi Major Irrigation ProjectMahiMadhya Pradesh2000-01Ongoing26.43490.28309.625347.6226.43
150Omkareshwar Major Irrigation ProjectOmkareshwar Phase I (CCA)Madhya Pradesh2003-04Ongoing24576.64164.283426.16910.8
151Omkareshwar Major Irrigation ProjectOmkareshwar, Ph.-IIMadhya Pradesh2007-08Ongoing19.578287.06111.853142.990.3
152Omkareshwar Major Irrigation ProjectOmkareshwar, Ph.-IIIMadhya Pradesh2007-08Ongoing48.592482.3682.086239.0217.2
153Pench Diversion Major Irrigation ProjectPench Div-IMadhya Pradesh2007-08Ongoing28.26834216.378232.720
154Punasa Lift Irrigation ProjectPunasa LISMadhya Pradesh2008-09Ongoing35.008464.17381.267391.2212.6
155Rajghat Unit - I Dam Major Irrigation Project_Madhya Pradesh Rajghat Dam (Completed)Madhya Pradesh1998-99Completed2004-05063363.210
156Sagad Medium Irrigation ProjectSagar(Sagad)Madhya Pradesh2011-12Ongoing17.061129.0614.75100
157Sanjay Sagar (Gomukh ) Medium Irrigation ProjectSanjay Sagar (Bah)Madhya Pradesh2011-12Ongoing17.807161.5312.97500
158Upper Wainganga (Sanjay Sarovar) Major Irrigation ProjectUpper Wainganga Madhya Pradesh1996-97Completed2002-0328.255100.7450.106100.7428.255
159Sindh Phase - II Major Irrigation ProjectSindh Phase IIMadhya Pradesh1998-99Ongoing159.0471,862.42474.4861,157.2381.91
160Sindh Phase - I Major Irrigation ProjectSindh Phase IMadhya Pradesh1999-2000Completed2007-0810.5821.8414.87628.2385.212
161Singhpur Medium Irrigation ProjectSinghpurMadhya Pradesh2011-12Ongoing10.2128.815.7500
162Upper Beda Medium Irrigation ProjectUpper BedaMadhya Pradesh2008-09Ongoing9.917208.688.348103.227.393
163Urmil RBC Irrigation Project_Madhya PradeshUrmil R.B.C. Madhya Pradesh2000-01Completed2002-032.1234.812.3914.812.123
164Bansagar Dam Major Irrigation Project_Madhya Pradesh Bansagar Unit-IMadhya Pradesh1996-97Completed2010-1101,379.07364.984980.820
165Indirasagar Dam (Unit - I)Indira Sagar Unit- I Madhya Pradesh1996-97Ongoing5,1502464,755.620
166Sangola Branch Canal Irrigation ProjectSangola Branch CanalMaharashtra2007-08Ongoing11.288183.24139.0695.565.815
167Tarali Major Irrigation ProjectTaraliMaharashtra2007-08Ongoing14.276481.66184.34217.553.766
168Chandrabhaga Medium Irrigation ProjectChandarbhagaMaharashtra2007-08Completed2009-101.9226.9122.6921.061.924
169Pothara Nalla Medium Irrigation ProjectPothra NallaMaharashtra2006-07Completed2008-095.15918.6820.59217.15.159
170Khadakwasla Major Irrigation ProjectKhadakwaslaMaharashtra2002-03Completed2004-050.6245.565.565.560.624
171Krishna Major Irrigation ProjectKrishnaMaharashtra2002-03Completed2008-0919.588262213.107217.18519.588
172Bhima Major Irrigation ProjectBhimaMaharashtra1997-98Completed2006-0758.7581,058.9944.505168.5544.017
173Kukadi Major Irrigation ProjectKukadi(CCA)Maharashtra2002-03Completed2008-0953.143463.4270.186337.5840.715
174Warna Major Irrigation ProjectWarnaMaharashtra2005-06Ongoing54.74958569.395229.145.875
175Upper Tapi Major Irrigation ProjectUpper TapiMaharashtra1997-98Completed2004-051.39817.67.717.51.398
176Upper Penganga Major Irrigation ProjectUpper PengangaMaharashtra2004-05Ongoing44.4721,511.82230.266397.5625.113
177Upper Wardha Major Irrigation ProjectUpper WardhaMaharashtra1997-98Completed2008-0937.258988.58247.024380.51734.522
178Waghur Major Irrigation ProjectWaghurMaharashtra1996-97Ongoing38.571,058.99363.752354.56313.655
179Chaskaman LBC Major Irrigation ProjectChaskamanMaharashtra2002-03Completed2008-0926.18911495.378129.02824.996
180Nandur Madhameshwar Major Irrigation ProjectNandur MadhmeshwarMaharashtra2006-07Completed2008-0924.623269.03218.702196.8232.246
181Nandur Madhameshwar Major Irrigation ProjectNandur Madhmeshwar Ph-IIMaharashtra2009-10Ongoing20.5195.41128.7138.460
182Jayakwadi Stage - II Major Irrigation ProjectJayakwadi Stage-IIMaharashtra2000-01Completed2004-057.27391.4843.73591.487.273
183Surya Major Irrigation ProjectSuryaMaharashtra1996-97Completed2006-072.96872.8413.5554.7680.46
184Bawanthadi Major Irrigation Project_MaharashtraBawanthadiMaharashtra2004-05Ongoing27.708678.81145.67464.4822.203
185Lower Godavari (Vishnupuri) Major Irrigation ProjectVishnupuriMaharashtra2000-01Completed2005-062.63617.795.4147.382.636
186Gosi Khurd (Indira Sagar) Major Irrigation ProjectGosikhurdMaharashtra1996-97Ongoing231.0817,111.5182,556.1163,349.42525.185
187Lower Wardha Major Irrigation ProjectLower Wardha (W)Maharashtra2006-07Ongoing63.3331,742.85154.688519.6317.379
188Wan River Major Irrigation ProjectWanMaharashtra1998-99Completed2005-0615.275108.6159.564113.3214.921
189Wan River Major Irrigation ProjectWan - IIMaharashtra2006-07Completed2008-095.0811.772.0300
190Arunawati Major Irrigation ProjectArunawati (W)Maharashtra2006-07Completed2008-090.76919.0621.6415.1860.769
191Punad Major Irrigation ProjectPunadMaharashtra2006-07Ongoing10.846161.42137.669109.1438.902
192Bembla Major Irrigation ProjectBemblaMaharashtra2007-08Ongoing52.5431,352.53619.865675.4627.505
193Khadakpurna River Major Irrigation ProjectKhadakpurna (W)Maharashtra2006-07Ongoing24.864693.37534.787477.5313.9
194Krishna Koyna Lift Irrigation ProjectKrishna Koyana LiftMaharashtra2009-10Ongoing104.167973.62347.76241.8320.267
195Lower Dudhana Major Irrigation ProjectLower Dudhna (W)Maharashtra2005-06Ongoing44.4821,056.42177.092580.6810.819
196Dhom Balkawadi Tunnel Major Irrigation ProjectDhom BalakwadiMaharashtra2007-08Ongoing18.1451.9393.786160.135.68
197Bahula Medium Irrigation ProjectBahulaMaharashtra2000-01Completed2006-074.30227.1211.52420.241.668
198Hatiz (Hingni) Medium Irrigation ProjectJawalgaonMaharashtra2002-03Completed2004-051.8072.732.732.731.807
199Kasari Medium Irrigation ProjectKasariMaharashtra2002-03Completed2004-051.2351.513.1951.511.235
200Kumbhi Medium Irrigation ProjectKumbhiMaharashtra2002-03Completed2006-075.43423.2318.619.293.604
201Kadavi Medium Irrigation ProjectKadviMaharashtra2002-03Completed2004-050.3651414140.365
202Dongargaon (Chnadrapur) Medium Irrigation ProjectDongargaonMaharashtra2005-06Ongoing2.76631.2916.89924.0321.977
203Hetwane Major Irrigation ProjectHetwaneMaharashtra2002-03Completed2008-096.168109.4150.49658.4370.546
204Shivana Takli Medium Irrigation ProjectShivna TakliMaharashtra2005-06Completed2008-096.38972.8516.415.046.39
205Patgaon Medium Irrigation ProjectPatgoanMaharashtra2004-05Completed2006-071.99221.513.97521.51.992
206Amrawati Medium Irrigation ProjectAmravati Maharashtra2005-06Completed2007-082.6069.821.1827.822
207Upper Manar Medium Irrigation ProjectUpper Manar(W)Maharashtra2002-03Ongoing8.28338.24279.736209.0114.339
208Kasarsai Medium Irrigation ProjectKasarsaiMaharashtra2002-032004-053.0363.371.6853.373.036
209Tajnapur Phase - I Lift Irrigation ProjectTajnapur LISMaharashtra2006-07Completed2008-093.6228.4726.438.4884.471
210Madan Medium Irrigation ProjectMadan Tank Maharashtra2005-06Completed2008-093.2812.761.5118.541.2
211Gadnadi Medium Irrigation ProjectGadnadiMaharashtra2009-10Ongoing3.473395.1737.8106.20.5
212Lower panzara (Akalpadda) Irrigation ProjectLower PanzaraMaharashtra2009-10Ongoing6.785132.44114.8761.92.075
213Kar Medium Irrigation ProjectKar (W)Maharashtra2006-07Completed2008-093.24478.818.59773.8281.675
214Pentakali Medium Irrigation ProjectPentakliMaharashtra2007-08Completed2009-103.2224.1823.2214.972.1
215Gul Medium Irrigation ProjectGul Maharashtra2005-06Ongoing3.02556.0724.88848.7691.331
216Lal Nalla Medium Irrigation ProjectLal Nalla (W)Maharashtra2006-07Completed2008-097.14439.0820.1727.4393.421
217Prakashe Bhandara Medium Irrigation ProjectPrakasha BarrageMaharashtra2007-08Completed2008-0910.307181.9844.25961.33910.307
218Purna River Medium Irrigation ProjectPurna (W)Maharashtra2006-07Completed2008-097.50759.647.51151.787.507
219Sulwade Barrage Medium Irrigation ProjectSulwade BarrageMaharashtra2007-08Completed2008-098.582133.08269.48474.88.582
220Utawali Medium Irrigation ProjectUtawaliMaharashtra2006-07Completed2008-095.07494.5241.05539.75.074
221Morana Gureghar Medium Irrigation ProjectMorna (Gureghar)Maharashtra2007-08Ongoing3.07568.99.8235.720.085
222Uttarmand Medium Irrigation ProjectUttermandMaharashtra2007-08Ongoing4.7332.977.97422.893.145
223Wang Medium Irrigation ProjectWang ProjectMaharashtra2008-09Ongoing7.06874.6614.52658.1040.615
224Sarangkheda Barrage Medium Irrigation ProjectSarangkhedaMaharashtra2007-08Completed2008-0911.51960.55348.94952.18311.519
225Sapan Medium Irrigation ProjectSapanMaharashtra2007-08Completed2009-104.42690.7978.60579.292.781
226Upper Kundlika Medium Irrigation ProjectUpper KundalikaMaharashtra2008-09Ongoing2.8118.188.72741.7940.84
227Arjuna Medium Irrigation ProjectArjunaMaharashtra2007-08Ongoing9.411333.87266.673216.6920.868
228Kudali Medium Irrigation ProjectKudaliMaharashtra2009-10Ongoing5.3277712.22360
229Lower Pedhi Major Irrigation ProjectLower PedhiMaharashtra2008-09Ongoing17.023255.97219.417154.680
230Nardave (Mahammadwadi) Medium Irrigation ProjectNaradave (Mahammadwadi)Maharashtra2009-10Ongoing7.924211.4630.26276.50.462
231Aruna Medium Irrigation ProjectArunaMaharashtra2009-10Ongoing9.027210.4533.862900
232Tillari Major Irrigation Project_MaharashtraTillari (Maharashtra Portion)(W)Maharashtra2005-06Ongoing6.57818.7389.339673.634.354
233Thoubal Major Irrigation ProjectThoubalManipur1997-98Ongoing29.449854.37482.839691.9110.861
234Khuga Major Irrigation ProjectKhugaManipur1996-97Ongoing15301.2163.384313.9610
235Dolaithabi Barrage Medium Irrigation ProjectDolaithabi BarrageManipur2002-03Ongoing7.545195.801121.192159.8630
236Imp. to Sason Canal Improvement to Sason Canal SystemOdisha2002-03Completed2004-0516.28234.9226.00940.1816.282
237Imp. to Salki ProjectImprovement to Salki IrrigationOdisha2003-04Completed2004-0520.148.658.6511.1120.14
238Salandi Major Irrigation ProjectSalandi Left Main Canal- 6.84 km - 14.33 km (Ambahata Canal)Odisha2002-03Completed2005-063.656.56.196.343.65
239Anandpur Barrage Canal Irrigation ProjectAnandpur Barr. Ph.-I / Integrated Anandpur Barr. Odisha1996-97Ongoing5.877617.4783.104272.075.877
240Potteru Major Irrigation ProjectPotteru(KBK) Odisha2001-02Completed2004-057.2831.1225.4364.927.28
241Rengali Project Phase - I Irrigation ProjectRengali Odisha1996-97Ongoing143.49633.49261.564606.74422.515
242Upper Kolab Major Irrigation ProjectUpper Kolab(KBK) Odisha1997-98Completed2004-0521.4103.556.512541.6421.4
243Upper Indravati Multi Purpose ProjectUpper Indravati(KBK) Odisha1996-97Ongoing86.389574.53518.122532.06566.338
244Kanupur Major Irrigation ProjectKanupur Odisha2003-04Ongoing29.578981.533612.751605.7440
245Lower Indra Major Irrigation ProjectLower Indra(KBK) Odisha1999-2000Ongoing38.871,192.456948.339909.58917.16
246Lower Suktel Major Irrigation ProjectLower Suktel(KBK) Odisha1999-2000Ongoing40.424901.24232.388303.030
247Rukura Medium Irrigation ProjectRukura-TribalOdisha2009-10Ongoing7.648112.6454.73727.5510
248Chheligada Medium Irrigation ProjectChheligada DamOdisha2003-04Ongoing3194.09913.12878.8140
249Ret Medium Irrigation ProjectRET Irrigation(KBK) Odisha2003-04Ongoing8.5273.8194.318108.5540
250Subernarekha Major Irrigation ProjectSubernarekha Odisha1996-97Ongoing183.1363,786.781,310.051039.858
251Telengiri Major Irrigation ProjectTelengiri(KBK) Odisha2003-04Ongoing13.829471.394145.332119.3290
252Titilagarh Stage - II Medium Irrigation ProjectTitlagarh St-II (KBK) Odisha1998-99Ongoing2.244.1949.706111.422.7
253Naraj Barrage Major Irrigation ProjectNaraj Barrage Odisha2001-02Completed2005-06039.9135.80535.720
254Remodelling of Channels of UBDC System Remodelling of UBDC Punjab2000-01Completed2006-07118177.79299.33164.35100.99
255Extn. of phase II of Kandi Canal (Hosh. to Bala.) Kandi Canal Extension (Ph.II) Punjab2002-03Ongoing23.326300.4392.43175.7917.728
256Ranjit Sagar Dam Major Irrigation Project_Punjab Ranjit Sagar Dam Punjab1996-97Completed2000-010717.48249.79694.830
257Irrigation To H.P. Area Below Talwara Medium Irrigation Project_Punjab Irr. to H.P. below Talwara Punjab2000-01Completed2005-06088.4938.09760.010
258Shahpur Kandi Dam Project Major Irrigation ProjectShahpur Kandi DamPunjab2001-02Ongoing0529.5855.886220.5280
259Gang Canal ModernisationMod. of Gang CanalRajasthan2000-01Ongoing69.694621.42217.738411.868.328
260Bisalpur Major Irrigation ProjectBisalpurRajasthan1998-99Completed2006-071.8224.5141.5661.851.8
261Chauli Medium Irrigation ProjectChauliRajasthan1998-99Completed2006-078.96390.2248.281109.088.96
262Gambhiri Medium Irrigation ProjectGambhiri (Modernisation)Rajasthan1998-99Completed2000-010.9251.951.3151.950.925
263IGNP Stage - II (Rajasthan Canal Stage - II) Major Irrigation ProjectIGNP Stage-IIRajasthan1997-98Ongoing1,0716,001.93582.724,122.7407
264Jaisamand (Alwar) Irrigation ProjectJaismand (Modernisation)Rajasthan1996-97Completed2000-012.3987.683.1257.682.398
265Mahi Bajaj Sagar Unit - II Major Irrigation ProjectMahi Bajaj SagarRajasthan1999-2000Completed2006-0718.406214.417113.652890.9618.406
266Narmada Canal Major Irrigation Project_RajasthanNarmada CanalRajasthan1998-99Ongoing245.8811,855.111,029.0521,445.33216.093
267Panchana Medium Irrigation ProjectPanchanaRajasthan1997-98Completed2004-056.10680.7543.37759.486.106
268Gumti Medium Irrigation ProjectGumtiTripura1996-97Ongoing7.6258.8140.64736.424.765
269Khowai Medium Irrigation ProjectKhowaiTripura1996-97Ongoing9.3253.3433.53949.9628.642
270Manu Medium Irrigation ProjectManuTripura1996-97Ongoing7.658.3752.10240.023.185
271Mod. of Lachura Head Works (Ch Charan singh)Mod. of Lachhura DamUttar Pradesh2005-06Ongoing14.575272.7166.903242.52931.91
272Modernization Of Agra CanalMod. of Agra CanalUttar Pradesh2002-03Completed2008-0935150.17744.619135.75337.8
273Arjun Sahayak ERM Scheme XI PlanArjun SahayakUttar Pradesh2009-10Ongoing44.381741.38307.896204.9280
274Restoration of Sarda Sahayak Canal SystemRestoring Cap. of Sarda SahayakUttar Pradesh2009-10Ongoing790319.2339.37585.5105.56
275Restoration/Improving intensity of Hardoi BranchImproving Irr. Intensity of Hardoi Branch SystemUttar Pradesh2006-07Ongoing95.961100.55424.79156.15683.188
276Gunta Nalla Medium Irrigation ProjectGunta Nala Dam Uttar Pradesh1996-97Completed1999-20003.881.311.33.88
277Sharda Sahayak Major Irrigation ProjectSarda SahayakUttar Pradesh1996-97Completed2000-01388.46268.3131268.3366.68
278Kachnoda Dam Major Irrigation ProjectKachnoda DamUttar Pradesh2009-10Ongoing10.8562.5464.675164.23.255
279Rajghat Canal Major Irrigation ProjectRajghat CanalUttar Pradesh2000-01Completed2008-0943.353218.6470.168196.9241.005
280Madhya Ganga Canal Stage - I Major Irrigation ProjectUpper Ganga including Madhya Ganga CanalUttar Pradesh1996-97Completed2003-0454.175393.07233.69393.0752.377
281Eastern Ganga Canal Major Irrigation ProjectEastern Ganga CanalUttar Pradesh1999-2000Completed2010-1172.286583.85194.872594.4569.125
282Saryu Nahar Pariyojana Major Irrigation ProjectSaryu NaharUttar Pradesh1996-97Completed2009-105056,323.29828.6192,118.983563.8
283Upper Ganga Canal Major Irrigation ProjectUpper Ganga including Madhya Ganga CanalUttar Pradesh1996-97Completed2003-0454.175393.07233.69393.0752.377
284Banganga Canal Medium Irrigation ProjectBansagar CanalUttar Pradesh1997-98Ongoing150.132452.275687.958492.3150
285Gyanpur Pump Canal Major Irrigation ProjectGyanpur Pump Canal Uttar Pradesh1999-2000Completed2001-021.547.3530.947.351.5
286Madhya Ganga Canal Phase - II Major Irrigation ProjectMadhya Ganga Canal Ph-IIUttar Pradesh2007-08Ongoing146.532946.315176.585463.8433.96
287Jarauli Pump Canal Major Irrigation ProjectJarauli Pump CanalUttar Pradesh2003-04Completed2006-0739.74818.837.07116.48217.625
288Providing Kharif Channel in Hindon Krishi Doab Providing Kharif Channel in H.K. DoabUttar Pradesh1996-97Completed2004-0511.04114.9573.27124.16411.038
289Rajghat Unit - I Dam Major Irrigation Project_Uttar PradeshRajghat Dam Uttar Pradesh1996-97Completed1996-97042.20360
290Lakhwar Multipurpose Project_UttrakhandLakhwar VyasiUttrakhand1997-98Deffered0578.42012.160
291Tehri Dam (Irrigation Share) Irrigation ProjectTehriUttrakhand1999-2000Completed2006-072701,011.44977.510
292Modernisation of DVCMod. of Barrage and Irri. System of DVCDamodar Valley CorporationWest Bengal1997-98Completed2007-08896.612140.9381.5784.896
293Kangsabati Major Irrigation ProjectKangsabatiWest Bengal1997-98Completed2001-0282.06113.23926.71113.23917.8
294Teesta Barrage, Phase -I, St.I, Sub Stage I Irrigation ProjectTeesta BarrageWest Bengal1996-97Ongoing342.151,001.4331.121369.6588.66
295Subernarekha Barrage Major Irrigation ProjectSubarnarekha BarrageWest Bengal2001-02Ongoing114.1982,862.8913.2881,456.810
296Patloi Medium Irrigation ProjectPatloiWest Bengal2000-01Ongoing2.15812.4315.1175.3770.27
297Hanumata Medium Irrigation ProjectHanumataWest Bengal2000-01Completed2009-101.2543.1381.7833.0381.189
298Tatko Medium Irrigation ProjectTatkoWest Bengal2000-01Ongoing1.19812.2495.9783.5530.674

(Source: India-WRIS WebGIS)